Vinamilk

Industry
VietNam Dairy Products Joint Stock Company (Vinamilk)
Vietnam Dairy Products Company Vinamilk in Binh Duong has the largest dairy factory in Southeast Asia, with a total initial investment of about 120 million USD. The factory covers an area of 20 hectares in My Phuoc Industrial Park in the Binh Duong province. It is a factory specializing in the production of milk with, an initial capacity of 400 million liters/year. This will increase to 800 million liters/year, in order to meet the growing demand in the South in the next 5 years.

This is a factory using the world’s most modern integrated and automatic technology that Tetra Pak has ever built. All stages from designing and building the factories to installing machinery, equipment, and production lines are in accordance with international and Vietnamese standards on food safety, hygiene and the environment.
Challenge​
  • Data is missing or being distributed to different storage places. Data-based monitoring is limited and does not guarantee a timely response.
  • Manual reporting is time-consuming and not highly accurate.
  • Searching for data is troublesome with the total amount of data that needs to be filtered in a certain time frame.
  • Setting up one camera is easy, but with multiple cameras in different locations, managing the various collected image feeds is difficult.
  • Security is not high.
Solution
  • Full centralization of data, which makes data quickly and accurately available on the same platform.
  • Monitoring, statistics and evaluation of data through reports, that have been set in the system.
  • The usage per user is logged.
  • Data alerts with easy-to-observe notifications through blinking, coloured signals.
  • Retrieve or print data at preset frequencies.
Benefits
  • Monitor data effectively and ensure timely resolution when data exceeds the threshold.
  • All user activities are stored so it is easy to look up and check details whenever something goes wrong.
  • By using the monitoring software there is no longer a staffing issue when additional monitoring stations are being installed to enable the growth of the factory and it’s production facilities.
Share:
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Can iLotusLand solve your problem?
More case studies